Retaining Wall: Aerotropolis City

Construction sites are messy. Are they not?

Building seven meters wide, twelve meters high and two kilometers long buttress retaining wall is no small feat. The project lasted for two years and Hummock Infrastructure proudly finished it within given parameters of Larson and Toubro.

Project Description:

  1. Location = Mohali, Punjab.
  2. Total Wall Length = 2000 meters.
  3. Type of construction = R.C.C Buttress Wall.
  4. Site Engineer = Jagjit Singh.
  5. Nature of site = Residential
  6. Project Cost (excluding material) = INR 1.0 crore (10 million)

Here are a few site pictures.

IMG-20131223-00030 2

A double reinforced steel mesh of 450 mm thickness made with steel bars of 16 mm and 12mm diameters.

IMG-20140104-00057 2

Concrete being poured into steel plates formwork using a transitory mixer.

IMG-20140105-00058 2

A small stretch of the under-construction two-kilometer long retaining wall.

interested in hiring our services? Please feel free to contact us.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s